
Separate the bid notice from the equipment destination
The engineer’s notice for Pace’s 2025 Water Well Improvement Project directs bids and document enquiries to Town Hall. That is a procurement address, not confirmation of where a hired toilet should be delivered. Obtain the actual authorised worksite and receiving instructions before using the notice to prepare a rental request.
Eley | McPherson’s plan room identifies the named Pace water-well project and marks its April 2026 bidding closed. The notice gives Town Hall on Jenny Washington Avenue for receiving bids and examining documents. It does not identify a portable-toilet position, confirm an award or establish that work is happening now.
For a contractor enquiry connected with this project, ask the authorised project contact for the actual work location, entrance and current work period. Do not copy the administrative address into the supplier order simply because it is the most visible address in the notice. Use the confirmed site information, not an assumed town-office drop-off.
Describe the crew facilities at the confirmed location
Once the site is identified, establish who will work there and which fixed toilets and washing points those people may use. A water-well project title does not establish an available water connection for rented washing equipment. Ask the responsible parties about the actual supported supply and used-water arrangement.
Discuss suitable standard toilets, accessible-use needs and washing for the confirmed crew and periods. Have the site controller approve the position and the provider assess ground, doors and delivery/service access. State any unresolved receiving or utility question before an order is accepted.
Keep the verified site in the ongoing service instructions
Give the receiver the accepted property and entrance details, plus the provider contact for a discrepancy. If a new work location is proposed, obtain a reviewed instruction rather than sending equipment to the earlier bid address or directing an informal move.
Include the actual model, dates, cleaning, tank care, paper, washing supplies, transport and collection in the quotation. The dated procurement record supplies project context only; it is not a current mobilisation schedule, site permission or promise that equipment is available for that project.
Questions before you book
Is Town Hall automatically the equipment delivery point?
No. The notice identifies its role in receiving bids and making documents available. Obtain the actual authorised worksite and entrance from the project contact.
Does closed bidding prove construction is underway?
No award, start or completion is established by the notice used here. Confirm the current project status before ordering for a work period.
Does a water-well project provide water for a handwashing station?
Do not infer an available or authorised connection from the project title. Confirm the supported washing supply and used-water arrangement.